Skip to content
How it works

Specified. Sourced. Delivered.

How Baikal Star coordinates architectural LED display packages from specification to handoff for luxury project teams.

Every project runs the same three phases: specify the package, source and QA the hardware, and deliver with the documentation the licensed project team needs to handle integration cleanly. Procurement scope only — installation and site work stay with the project team.

Who this is for

Who runs this with us.

Project teams running an RFQ

Procurement scope, factory QA, and integration documentation prepared for the licensed project team.

AV integrators specifying displays

Controller scope, calibration records, and cabling guidance handed off for the integrator's installation work.

Architects & designers

Display dimensions and surface treatment specified to the room and architectural intent.

Owners coordinating a single procurement partner

One scope for OEM sourcing, factory QA, spare planning, logistics, and documentation through handoff.

What we specify for

What we review at specification.

Procurement, not contracting

Baikal Star supplies the display package and documentation. Installation, electrical, mounting, and permitting stay with the licensed project team.

Specification is a conversation, not a form

Dimensions, daylight, viewing distance, pitch, and content workflow are reviewed for the room before the package is configured.

QA happens at the factory, not on site

Calibration and a 72-hour factory aging test are coordinated with the OEM before shipment.

Documentation is the handoff

Specifications, control protocols, cabling guidance, and spare inventory are prepared for the project team's installation work.

Scope of supply

What we deliver at handoff.

Specifications & configuration sheet

Dimensions, pitch, controller scope, brightness, and content workflow — documented as configured for the room.

Control protocols & cabling guidance

Signal routing, control-system protocols, and cabling expectations prepared for the integrator's installation work.

Calibration records & factory QA report

72-hour factory aging results and calibration records transferred with the package.

Spare inventory & handoff materials

Planned spare-module reserve and physical handoff materials delivered to the licensed project team.

Process

Specified. Sourced. Delivered.

Specify

Dimensions, viewing distance, pixel pitch, brightness, controller, and content workflow are reviewed for the room.

Source & QA

Vetted OEM package, spare-module reserve, calibration, and a 72-hour factory aging test are coordinated before shipment.

Deliver & handoff

Package, spare inventory, integration documentation, and handoff materials are prepared for the client's licensed project team.

01 · Specify
  • Project dimensions, viewing distance, pixel pitch, brightness, and surface treatment reviewed against the room.
  • Controller scope, content workflow, and signal routing reviewed against the integrator's plan.
  • Spare-module reserve sized to surface area and expected operating-hours profile.
02 · Source & QA
  • Vetted OEM package qualified against project specification.
  • 72-hour factory aging coordinated with the OEM before shipment.
  • Calibration checks and color targets recorded at the factory.
  • Spare-module reserve scoped and prepared with the shipment.
03 · Deliver & handoff
  • Specifications and configuration sheet delivered to the project team.
  • Control protocols and cabling guidance prepared for the integrator.
  • Calibration records and factory QA documentation transferred.
  • Spare inventory delivered with the package.

Baikal Star supports procurement, sourcing, QA, logistics, documentation, and integration-support handoff. Installation, electrical work, mounting, permitting, millwork, and on-site construction are handled by the client's properly licensed project team.

Frequently asked

Questions about this service.

What does Baikal Star do that an AV integrator doesn't?

Procurement-specific scope: OEM sourcing, package specification, factory QA coordination, spare-module planning, logistics, and integration documentation. The integrator's installation and on-site work continue as they normally would.

How long does the typical specification phase take?

It depends on dimensions and site complexity. The phase wraps when the package documentation matches the project team's installation scope — there is no fixed turnaround.

Does Baikal Star manage installation?

Baikal Star supports procurement, sourcing, QA, logistics, documentation, and integration-support handoff. Installation, electrical work, mounting, permitting, millwork, and on-site construction are handled by the client's properly licensed project team.

Can the process work with our existing GC or integrator?

Yes. Specifications, control protocols, and cabling guidance are prepared for the licensed general contractor, AV / low-voltage integrator, architect, or designer the client has engaged.

Estimate a Project